Transparent Pricing

Bathroom Renovation Pricing Guide

Real cost ranges for Ottawa and Orleans bathroom renovations — based on our 10+ years of completed projects. Itemized written estimates are always provided before work begins.

Why We Publish Pricing

Most contractors don't publish prices. We do, because we've found that homeowners who understand the cost drivers make better decisions, have fewer surprises, and get a better result. These are honest ranges — not "starting at" teaser prices.

Shower Renovations

Custom Shower Renovation Costs

All prices include waterproofing, substrate, tile installation, grout, and silicone.

Example herringbone tile bathroom renovation
MOST POPULAR

Typical Shower Renovation

Alcove or walk-in, full waterproofing, standard-to-large tile format, 1–2 niches. This is our most common project type.

$6,500 – $12,000
Project Type Typical Range What's Included Timeline
Alcove Shower Renovation
Three-wall tile surround
$6,500 – $12,000 Demo, board, waterproofing, tile (standard format), grout, fixtures 4–6 days
Walk-In / Curbless Shower
Linear drain, open entry
$9,000 – $16,000 Pre-slope, full membrane, linear drain, large-format tile, grout 5–8 days
Large-Format Slab Tile Shower
60×120cm or 80×160cm porcelain
$11,000 – $18,000+ Precision substrate, lippage system, full slab tile, minimal grout joints 6–9 days
Tub-to-Shower Conversion
Remove tub, build new shower
$7,500 – $14,000 Tub removal, framing, plumbing prep, waterproofing, tile 5–7 days
Steam Shower
Full enclosure, vapour proof
$14,000 – $25,000+ Schluter Kerdi system, sloped ceiling, steam unit prep, full tile 7–12 days

Shower Add-Ons & Upgrades

Heated Floor (electric mat)
Mat + thermostat supply and install
+$800–$1,600
Built-In Tile Niche
Per niche, tiled interior, waterproofed
+$350–$600
Built-In Tile Bench
Framed, waterproofed, tiled
+$600–$1,200
Linear Drain Upgrade
Schluter or equal, 24–48" range
+$400–$900
Mosaic Floor Tile Upgrade
vs. field tile on the floor
+$300–$700
Herringbone Pattern Upcharge
On walls or floor, added layout time
+15–25%
Tile Installation

Tile Labour Rates

Ottawa-area labour pricing for tile installation. Tile materials are billed separately based on your selection.

Tile Format / TypeLabour RateNotes
Standard Floor Tile (up to 18×18)
Straight or brick lay, cement board
$12–$16/sq ft
Most common rate
Large-Format (30×60cm+)
Full coverage mortar, lippage spacers
$18–$26/sq ft
Includes substrate prep
Herringbone / Pattern Layout
Added to base rate
+15–25%
Layout complexity
Mosaic / Small-Format Tile
Sheet-set, complex cuts at borders
$20–$32/sq ft
More labour-intensive
Natural Stone
Stone mortar + sealer
$22–$35/sq ft
Includes sealant
Heated Floor (under tile)
Electric mat + thermostat
+$800–$1,600
Elec. connection extra

Full Bathroom Renovation Costs

A full bathroom renovation includes demolition, plumbing, tile, vanity, toilet, and all fixtures. Cost varies significantly based on finishes and scope of plumbing work.

Powder Room (half bath)

Tile floor, vanity, toilet, fixtures

$6,000–$14,000
turnkey

Main Bathroom (full, standard)

Shower or tub/shower, tile floor + walls, vanity, toilet

$18,000–$32,000
full scope
MOST POPULAR

Master Ensuite (mid-range)

Custom tiled shower, large-format floor, double vanity, heated floor

$28,000–$45,000
full scope

Luxury Primary Bathroom

Large-format slab, curbless shower, freestanding tub, in-floor heat

$45,000+
premium scope

What Affects Your Price

Tile SelectionStandard porcelain vs. premium large-format vs. natural stone — the spread can be 3–4× in material cost alone.
Demo ScopeTile-over-tile possible in some cases. Full demo with substrate issues adds time and cost.
Layout ComplexityHerringbone and diagonal patterns take 20–30% more time than straight lay.
Plumbing ChangesMoving a drain or shower head location requires a licensed plumber and adds cost to the project.
ExtrasHeated floors, built-in niches, benches, linear drains, and glass enclosures each add to the total.
Pricing Questions

Frequently Asked Questions

Yes, always. Every estimate we provide is written, itemized, and covers labour, materials (if we're supplying), and any subcontracted work. There are no surprise line items. The estimate is binding — the price we quote is the price you pay unless the scope changes.
No. On-site estimates are free. For complex projects, we may ask you to complete a brief project questionnaire before booking a visit so we can prepare and make the site meeting as efficient as possible.
Yes. Many clients source their own tile through Centura, Ciot, Home Depot, or specialty importers. We'll give you a precise quantity recommendation and can advise on tile suitability. We still supply setting materials (mortar, grout, waterproofing membrane) unless you specifically request otherwise.
Standard payment terms: a deposit to schedule (typically 25–35%), progress payment at substantial completion of waterproofing, and final balance on project completion. We accept e-transfer and cheque. All payment terms are outlined in the written contract.
We won't price-match work done without proper waterproofing, correct substrate, or the right setting materials. If another quote is significantly lower, it's worth asking what's being cut. The cost of fixing a shower done poorly — demo, mould remediation, re-tile — is often 150–200% of the original project cost. We build it right once.
Next Step

Get an Itemized Estimate for Your Bathroom

Send us photos, a rough description of your project, and your preferred timeline. We'll respond within 24 hours.